Home › Criteria › Infrastructure › L4
Criterion · v1Infrastructure L4 — Calibrating
https://aiposture.org/criteria/v1/infrastructure/4
Assertion
We scan continuously. Drift is tracked.
Evidence
- Scans on defined cadence.
- Drift log.
- Outer-surface claims verified against internal reality on a cycle.
Test
Produce cadence record, drift log, claim-reality reconciliation.
Metadata
- Vector
- Infrastructure
- Level
- 4 (Calibrating)
- Source
- rubric.json
- Profile
- EARL v0 profile
- License
- CC BY 4.0
- Stability
- Stable IRI — never re-minted, only superseded under a new namespace version.
Infrastructure criteria
| Level | Name | Assertion |
|---|---|---|
| L1 | Perceiving | Agents may interact with our systems. We have not measured readiness. |
| L2 | Assessing | We have scanned our infrastructure for agent readiness. |
| L3 | Integrating | We have acted on what the scan showed. |
| L4 | Calibrating | We scan continuously. Drift is tracked. |
| L5 | Engineering | Agent-readiness is engineered into how systems are built and shipped. |